Agree the boundary
Start with one representative service connection, message exchange or certificate workflow in an agreed test environment. Name the devices, software versions, network conditions, integration points and people responsible. Select signing and key-establishment requirements separately.
- Inputs: the relevant tender or internal requirement, current configuration, intended target and project dates.
- Before execution: agree authorised access, test identities, maintenance window, data handling and evidence retention. Use test data and keep production secrets out of enquiry forms.
- Confirm feasibility, deliverables, schedule and cost in the written scope. Additional clients, transports, voice and hardware integrations are scoped separately.
Choose the change to test
Name the starting configuration and target. Confirm which clients, libraries, issuers and key stores support both. A profile change may require new identities and trust rather than an in-place update. If no supported path exists, the pilot records the gap and the work needed.
Key rotation, a larger parameter set and replacement by a different algorithm are distinct changes. Testing one does not prove the others. The scope must say which is being evaluated and why it addresses the buyer’s requirement.
Agree observable acceptance criteria
Set expected outcomes and any numerical limits with the buyer before execution. The following is a starting matrix to tailor to the chosen workflow.
| Check | Evidence needed |
|---|---|
| Baseline | Approved peers complete the agreed workflow under the recorded starting configuration. Capture authentication and key-establishment parameters separately. |
| Supported transition | Repeat the workflow under the target configuration. Record changed software, keys, certificates and trust, with the operator procedure. |
| Retirement and rejection | After the agreed cutover, a retired credential or disallowed profile is rejected. Verify that retry or negotiation does not silently bypass the policy. |
| Mixed versions and queued work | Test the agreed client combinations and messages pending at cutover. Record delivered, rejected and expired work; identify any required service pause. |
| Interruption and recovery | Interrupt a chosen transition step and restart. Recover to an approved state; demonstrate that stale trust or retired key state is not reactivated. |
| Operational impact | Measure the agreed setup time, payload or certificate size, resource use and interruption on the named devices and links. Compare with the limits in the scope. |
Review the deliverables
The proposed deliverables are a configuration record, repeatable test procedures, a completed acceptance matrix and a review with the buyer. Each finding includes expected and observed behaviour, an evidence reference and a status: passed, failed, blocked or not tested.
Record limitations and unsuccessful cases alongside successes. Assign owners and follow-up actions. The review should support a decision to proceed within the tested scope, undertake more engineering or reconsider the proposed configuration. Remove private keys and sensitive operational data from shared reports.
What the existing evidence establishes
The communications and PKI repositories document category 3 and category 5 configurations, renewal, key retirement, recovery and refusal of mismatched profiles. They also record upgrades within an existing profile. These are engineering records, not an independent security audit.
They do not establish a seamless in-place switch between categories or support for an arbitrary future algorithm. Both current categories use ML-KEM and ML-DSA; choosing different parameter sets does not provide diversity between algorithm families. Customer hardware, service continuity and the exact requested transition need their own evidence.
A pilot does not confer legal compliance, product certification or proof against every future attack. Algorithm changes cannot reverse an earlier disclosure of data.
Bring one workflow and the decision you need to make
Tell us which system is being purchased or changed, the requirement it must satisfy, the proposed transition and your target date. We will use that context to agree a feasible evaluation.